19. March 2025
Schedule-based documentation – mydocma RP & Asta Powerproject optimally networked
Documentation, schedules and BIM in perfect harmony - thanks to the seamless integration of the mydocma RP construction documentation module and Asta Powerproject scheduling software. Find out how you can benefit from optimised, schedule-based documentation thanks to the cooperation between edr software and Asta Development.

Collaborative solution for deadline-based documentation
Precise scheduling and seamless documentation are essential for successful construction projects. The seamless connection of our construction documentation module mydocma RP to the scheduling software Asta Powerproject creates optimal synergies: a plugin-based interface connects both systems, enables dynamic construction plan adjustments based on data recorded on site and ensures that the documentation is always up-to-date.

NEW: Asta Powerproject 4D with BIM integration
Asta Powerproject 4D seamlessly links 3D models and BIM data with construction scheduling. Simple IFC integration and drag & drop functionality allows BIM objects to be directly assigned to tasks in the schedule, automatically synchronising changes. 3D object splitting enables precise assignment to sub-processes, while detailed resource planning and target/actual comparisons with 3D visualisation optimise construction progress. A visual project simulation with video export and the free BIM model view for project partners ensure greater transparency and reduce planning errors.

Top facts of the mydocma RP construction documentation
- Mobile documentation directly on the construction site
- Report entry via categories e.g. activities, personnel, material, equipment, etc.
- Automatic integration of due activities in the report
- Precise documentation of the degree of completion
- Target/actual comparisons based on the schedule & statistical analyses
- Various evaluation variants for construction process disruptions
- Documentation of large projects in main project & sub-projects
- Coming soon: construction progress-related integration of suitable checklists

Construction documentation & construction scheduling hand in hand
- Data coherence: More consistency and accuracy thanks to synchronised documentation and planning statuses
- Reporting: Precise reports and target/actual comparisons thanks to a correlating database
- Process optimisation: Fewer redundancies, clear dependencies, maximum time savings thanks to automated data reconciliation.
- Resource management: Increased efficiency through targeted optimisation of the use of resources
- Flexibility: Individual adaptation to the specific requirements of each project






