Munich People’s Theatre

Munich Volkstheater in the old cattle yard, © Roland Halbe

Project data

Builder:

City of Munich

General contractor:

Georg Reisch GmbH & Co. KG

Architect:

LRO Lederer Ragnarsdóttir Oei GmbH & Co. KG, Stuttgart

Location:

Munich

Completion:

Spring 2021

Costs:

approx. 131 million

Software used:

mydocma MM for defect management, mydocma RP for construction documentation & mydocma PX for image management

Project description

Flanked by listed old buildings, the new Munich Volkstheater on the former cattle yard site picks up on the brick architecture of the surrounding area. The building comprises a main and side stage, foyer with bar, rehearsal rooms, workshops, artists’ dressing rooms, flats, offices, storage and a day care centre. It is being built by the Swabian construction company Georg Reisch on a turnkey basis on almost 18,000 square metres and rises over staggered eaves heights along Tumblingerstrasse. The 27 metre high stage tower is set back so as not to dominate the street scene too much. Visitors enter the entrance courtyard through a striking archway, which also houses the beer garden of the adjoining restaurant. In the light-flooded foyer, a curved staircase leads to the large theatre hall with a total of 600 seats.

Success story: Top start for the mydocma construction software

If you have further questions don't hesitate to contact us.
We are looking forward to your inquiry.

Claudia

Technical Editor

SHARE PROJECT

These customers rely on edr software

Grassl Beratende Ingenieure Neusser Bauverein Paulaner